We have really turned a corner. There was a lot of activity early last week, but I did not post any pictures because the work was all finish work that isn't flashy. We did get our new fridge on Friday. 
Here are some pictures:

Getting the fridge into the kitchen was quite a chore. The delivery men had to take the doors off to get the fridge through the front gate. Turning the corner to get down the side of the house was another chore. They were not fazed by any of the obstacles, and it really didn't take them very long for the whole process. We compromised and got water and ice on the door. It was a feature that we really didn't want. The water line has a filter which is a feature we did want.  We won't have ice in the ice maker until the wall behind the fridge gets painted and the water line is hooked up. I will not miss having to fill trays if I want ice.



Some of the work that still needs to be done includes crown molding on the cabinets, the drawer fronts with the bad finish need to be replaced (waiting on those to come in), the pulls need to be put on all the drawers (it is a major pain to open the drawers without the pulls and the pulls won't be installed until all the new drawer fronts arrive), walls and trim painted, the antique piece needs to be attached to the wall, and some other small details. All the roll outs were installed in the bottom cabinets. I love them. It makes it so easy to get to everything. 

No comments:

Post a Comment